The “2019 Pinal Model and 100-year Assured Water Supply Projection Technical Memorandum” — an analysis of the Pinal County area’s groundwater conditions, performed by the Arizona Department of Water Resources, is now complete and available for viewing.
The model can be viewed here.
# # #
Pingback: 2019 Pinal Groundwater model released — Arizona Water News | Coyote Gulch